Civil Defense Building Re-Roof Project Scope of Work

1)  Remove existing roofing to the existing concrete deck and properly dispose.

2)  Install new 1/8" tapered polyiso insulating sloping from the front of the building to the rear of the building.

3)  Install new 1/4" hard coverboard

4)  Install new hot asphalt applied 2 ply modified bitumen roofing system with fire-retardant granular white capsheet.

5)  Install additional treated wood nailers as required and new prefinished 24 gage edge mental all around.

6)  Re-flash all existing roof penetrations, including disconnecting/reconnecting HVAC as required.

7)  Provide contractor 2  year warranty and roofing manufacturer's twenty (20) year NDL roof warranty.